Body
Drawing Rev C, hull plate 14, hot work permit signed 07:10, clear. Four hours holding the grinder steady on the bevel, forearms warm and then buzzing by ten, the vibration staying in the hand after I put it down. Sweat gathering at the small of the back where the harness sits. Checked the respirator seal with both hands, twice, nobody mentions it any more. Jaw tight from 11:30 when I messaged the training centre about the assessment date and watched the screen. Football cancelled for rain, so legs fresh, walked home from the rank. Changed out of yard clothes before lifting my son. Next check: forearm stretch tonight, owner me.
Emotion
The centre replied at 14:05: Assessments are expected in February, we will let you know. Exact words. Expected. We will let you know. I read it standing next to the permit board and was angry for about twenty minutes, then something worse, which was that I was nine years old with the kitchen calendar again and a return date in pencil. My wife said at supper that February is more than we had on Monday. She is right. I said I know. I did not say it kindly. Later I apologised for the tone and she said I could apologise by eating the food while it was hot.
Mind
Three study timetables built for a date that does not exist. Today I merged them. One timetable, two versions: if the assessment is early February, practice plates four evenings a week from 4 January. If late February, three evenings plus one extra Saturday. One trigger: when the date is confirmed in writing I switch version, until then I follow the smaller one. That removes the rebuilding. It does not remove the waiting, but the waiting now has a rule. I wrote I will see at the top of the page, crossed it out, and wrote expected. Next check: call the centre Monday 09:00 about written confirmation, owner me.