Player toenailed
Mind
bookcase for the library. the north wall is out of plumb 5/8 over eight feet, i found that with the level before they finished asking. so the case has to be scribed to the wall and cleated, toenailed through the back at an angle because there's no getting at the stud straight. shelves on adjustable pins or fixed, the Sacramento people didn't say. fixed is stronger. adjustable is what they'll want in ten years when they own different books. i'll build the carcass in the shop, dry fit in the room, scribe on site. next is measuring the room again, twice, no matter how many photos i already have.
Emotion
walkthrough at the lake house. the woman stood at the bottom of the curved stair a long time and put her hand on the rail and walked it up slow and then down. her husband said it looked like it grew there. i said thanks and looked at my boots. they want a bookcase in the library, floor to ceiling, built in. i said can do. didn't say i'd been hoping they'd ask. went out to the truck and sat a minute before i started it. good day. a real good one, though i won't say it that way at home, just good day, and she'll know from my face which kind.
Body
lake house, 9 hrs. back and knees pretty much one thing by two o'clock, a day on the subfloor with the pads on. dust in the sinuses so bad the sneeze came at the coffee pot in the morning and again at the walkthrough, which the Sacramento people were nice about. cold day, the left index tip ached like it was still there, it does that under 30 degrees. ate lunch standing in the garage, the sandwich she made. stretched the back on the tailgate at four with the dogs watching, they don't get it. chop saw earplugs in all day, ringing a little after anyway.